Resolute Mining Ltd (ASX:RSG) managing director and chief executive John Welborn talks Proactive Investors through the multinational gold producer’s definitive feasibility study (DFS) update on the flagship Syama Gold Mine in Mali.
The update includes a reserve upgrade, and demonstrates a material reduction in the all-in sustaining costs across the whole life of the mine, which has been extended by four years.
“We’ve been doing a lot of work primarily on implementing automation as part of our underground mine, improving our power infrastructure at Syama, and continuing our processing journey to get higher recoveries from the ore. And all of that’s come through in a really exciting announcement today,” says Welborn.
Sandvik has been appointed to manage the automation process at Syama.
Related Post:
- ‘LIVE’ DFS Token Update | How To Transfer DFS Coin To MyEtherWallet | DFS Value 0.5 ETH For 5000 DFS
- 'LIVE' DFS Token Update | How To Transfer DFS Coin To MyEtherWallet | DFS Value 0.5 ETH For 5000 DFS
- “Major BTC Adoption Is COMING, PRICES Will RISE Substantially” – Why BTC Acceptance Is CRITICAL
- Draft Daily DFS Coin Update (Must Watch) DFS
- How Much It Costs To Mine For Cryptocurrency
- HOW TO MINE XMR MONERO FOR FREE! (Using a VPS, without power consumption costs)
- Airdrop Update, 5000 DFS Received worth 0.5 ETH, Fuzex Update, Cinemawell Update, Ubex update
- EASY !! MININGS LIVE – DAFTAR DAN DAPATKAN 200 TRON/TRX COIN GRATIS – BEST MINING OF THE YEAR
- WAW !! DAPAT 13400 TRON / TRX COIN GRATIS DARI MININGS LIVE DAN LANGSUNG WITHDRAW – EASY !!
- SUMPAH LEGIT !! DAPAT Rp.6.700.000 DARI MINING TRON/ TRX COIN – DAFTAR MININGS LIVE DAPAT 200 TRX