PART 11 – TAHOE NEO.HOE PROJECT REBUILD

PART 11 – TAHOE NEO.HOE PROJECT REBUILD

THAT’S RIGHT, PART 11 IS HERE. Starting to fab up the side panels in NEOHOE to fit (3) Apocalypse AAB-2800.1D and (1) Apocalypse AAK-200.4D on each side, powering (36) Crescendo FT1 and (36) UN10.

-CHECK OUT NEO.HOE 2018 BUILD VIDEOS–
https://www.youtube.com/playlist?list=PLGIhkmzkqQXXofiufemUpQFSVXDAQY-3H

-SUBSCRIBE-
https://www.youtube.com/user/jat4011?sub_confirmation=1

-HIGH VOLTAGE CAR AUDIO-
For pricing and custom build details, check out my FACEBOOK BUSINESS PAGE, @jthvca

-WANT TO SUPPORT HVCA?-
Become a Patron and gain access to in-depth TIPS AND TRICK videos, behind the scene project videos and drawings for free fabrication tools and materials.
https://www.patreon.com/HVCA01

-STAY CONNECTED-
Facebook, @jthvca
Instagram, @jthvca

Related Post: